Construction of power lines

Construction of power lines

New power lines

The construction and maintenance of the high voltage power lines is the basic activity of ZOvit ZRt.

Temporary power line towers

Repair of high voltage power lines.

Establishing of optical cable network

The great advantage of these glass fibre cables is not influenced.

Hot line maintenance

Ovit ZRt. has a complex, self-developed technology for repairing and maintaining.

Rehabilitation

The Department for Design and Technology of Power Lines took an active part in the development.
Personal changes and modification of the organizational structure
2009-10-02

According to the modification of the Rules of Organization and Operation entered into force as of 1 July 2009, the Company’s organization has been changed as follows

The National Power Line Company is sixty years old
2009-10-02

We are pleased to inform You that the National Power Line Company celebrates the 60th anniversary of its establishment on 17 March 2009. According to the Articles of Incorporation dated 17 March 1949 the company was established to design and construct high-voltage power lines and to organize and control the rural electrification activity of the distribution companies.

Accomplishment of the reconstruction of Göd 400/220/120/18 kV substation
2009-10-02

During the past years important primary and secondary reconstructions were carried out at the substations of transmission network. The reconstructions of the 50-year-old Göd substation stood out from these considering the technical extension as well as the complication of the work.